This week in numbers
23–29 Oct 2026, against 16–22 Oct.
Your October enquiries, did they turn into work?
12–19 Oct 2026, newest first
Pick an outcome for each one and a rough job value if you won it, then hit send. It's the only way we find out which ads bring you paying work rather than just enquiries.
| Who | What they asked for | Outcome | Job value (AUD) |
|---|---|---|---|
| MerryWebsite26 Oct · Perth | 18 double power points and 3 data points, with skirting duct and cabling | ||
| MarkWebsite26 Oct · Henley Brook | An electrical point in the bathroom | ||
| ChloeFacebook / Instagram26 Oct · Bayswater | Install a wall oven and a built-in microwave, 4 kitchen downlights and 4 new power points | ||
| NorinaWebsite25 Oct · Lesmurdie | Move the overhead power connection off the bargeboard to a rafter bracket, including the Western Power disconnect and reconnect | ||
| TerryGoogle ad24 Oct · Girrawheen | Split system air conditioning | ||
| BrendanGoogle ad23 Oct · Gwelup | EV charger installation | ||
| LindaFacebook ad19 Oct · Atwell | A list of small jobs: 9 outdoor wall lights, 2 bathroom 3-in-1 units, 3 lights to downlights | ||
| BjornGoogle ad18 Oct · Bicton | EV charger installation, after a price. You've already replied asking for photos. | ||
| GaryFacebook ad18 Oct · Aveley | General residential electrical, as soon as you can | ||
| LachlanWebsite16 Oct · Northbridge | Quote for spotlights, a power upgrade and flood lights at his workplace | ||
| ShaunWebsite14 Oct · Como | Single phase EV charger, about 20 halogen downlights to LED, an ethernet wall port, outdoor floodlights | ||
| BrookeGoogle ad13 Oct · Craigie | No power at home, RCD 1 keeps tripping | ||
| KristieFacebook ad12 Oct · Walliston | Fault finding on a bathroom and toilet with no power, front lights out, plus downlights, a fan switch and an outdoor power point |
September enquiries still waiting on an outcome (27)
The 10 missed website enquiries from September
Main website contact form, 6–28 Sep 2026, newest first
| Who | What they asked for | Outcome | Job value (AUD) |
|---|---|---|---|
| Blake28 Sep · Fremantle | Diagnose oven, possible replacement | ||
| Richard23 Sep · Caversham | Theatre room lighting and dimmers (Buster + Punk), feature lights on front pillars, dark-colour double GPOs in the kitchen, double GPO in the garage for the roller door | ||
| MarzOngoing commercial22 Sep · EV Dealer Group (BYD) | Wants a reliable team to install EV chargers for his clients, ongoing work not a one-off jobShowing a Melbourne postcode, worth checking where the work actually is | ||
| Nora22 Sep · East Perth | Apartment reno, kitchen/bathroom/laundry disconnected and made safe before demolitionAsked for availability and cost | ||
| Daniel21 Sep · Balcatta | 2 single power points to doubles, 1 new double on a double brick wall | ||
| Hugo20 Sep · Trigg | Clipsal 16A RCBO, 15m of 4mm cable and a 15A GPO into the garage, existing Delta 12 switchboard | ||
| Carmelo19 Sep · Wembley | Locked out of the main switchboard room after a fuse cut outMay already be sorted, worth a call | ||
| Adrian17 Sep · Balcatta | Redo all internal and external lights, ceiling fans to the alfresco and bedrooms, price to upgrade the switchboard | ||
| Elyse13 Sep · Midvale | EV charger already on the wall, needs isolator, conduit, about 12–13m of cabling and an RCBO in the board | ||
| Scott6 Sep · Rivervale | Extra double power points in 7 rooms, plus data/TV points in the master, study and living room |
Your September enquiries, did they turn into work?
17 real enquiries, 1–23 September 2026, straight out of your CRM
This is the bit that matters more than any ad number. We know what each enquiry cost, we don't yet know what it was worth. Pick an outcome for each one, put a rough job value in where you won it (ex GST is fine), and hit send. Takes two minutes and it tells us which ads to put more money behind.
| Who | What they asked for | Outcome | Job value (AUD) |
|---|---|---|---|
| Rudy1 Sep · Canning Vale | Switchboard upgrade, EV charger install, downlights on the propertyWanted: ASAP | ||
| Gavin1 Sep · Willetton | Meter box needs updating | ||
| June2 Sep · Heathridge | 3 x power points into new wall cupboards (asked about conduit), plus 4 x downlights, has the suppliesWanted: Within 1–2 weeks | ||
| Leigh7 Sep · Landsdale | Roughly 25 downlights (new and replacements), move a couple of switches, 3 new outdoor lights plus extras, replace 2 outdoor fans, 1 new indoor fanWanted: No rush | ||
| Matthew8 Sep · Morley | Supply and install 2 split system aircons in bedroomsWanted: Within 1–2 weeks | ||
| Roseann13 Sep · Rockingham | 5 LED downlights replaced, electric wall oven install (old one removed), rangehood install, ceiling fan replacedWanted: ASAP | ||
| Wayne16 Sep · Bassendean | Split systems for bedroom, office and living roomWanted: ASAP | ||
| AnthonyFacebook ad17 Sep · Baldivis | Ceiling fan installs, capped provisions and wall switches already in place from the buildWanted: No rush | ||
| Carmelo19 Sep · Wembley | Door unlocked to get access to the main switchboard room, fuse cut out | ||
| Hugo20 Sep · Trigg | Quote to install a Clipsal 16A RCBO, 15m of 4mm cable and a 15A single power point into a garage with an existing Delta 12 switchboard | ||
| Daniel21 Sep · Balcatta | 2 single power points changed to doubles, plus 1 new double outlet on a double brick wall | ||
| Nora21 Sep · East Perth | Apartment renovation: kitchen, bathroom and laundry electrical disconnected and made safe before demolition | ||
| HansFacebook ad22 Sep · East Victoria Park | Quote to install a 3-pin 32A socket on its own circuit on the garage wall, for a portable 7kW EV charger. Sent a photo throughWanted: No rush, flexible | ||
| Marz22 Sep | Looking to set up a reliable team to install EV chargers for his clients (ongoing work, not a one-off job) | ||
| CarmelaFacebook ad23 Sep · Beeliar | Quote for a switchboard, not sure whether it needs replacing or adding to. Power always switches off when the laundry and kitchen are both on | ||
| Richard23 Sep · Caversham | Home theatre: 4 wall lights to a new dimmer, 1 picture light to a new dimmer, socket for an LED strip light in the roof space | ||
| SaifGoogle ad23 Sep · Piara Waters | EV charger install, after a 22kW chargerWanted: ASAP |
What we need from you
Three things, all quick
- NowFor youPick an outcome for the enquiries above and hit send, so we know which ads deserve more of your budget.
- NowFor youLog in to your new leads board (the invite went to info@ and Pam on 27 Oct). Every enquiry is already on it, so you or Pam can call them back and move each one along.
- NowFor youSend Chris a date for the Highgate project, so we can get content shot on site.
What's next
Over the next couple of weeks
- NowDoneYour Facebook ads are still switched off while you're booked out. They're due back on around 6 November with fresh videos, and Chris will check with you first.
- NextPlannedMore blog posts going up on your main website, each one answering a question people search before they hire, like what a power point installation or a switchboard upgrade costs.
Notes & feedback
Anything you want changed, added, or explained further
Got a question about anything above, or something on your mind? Write it below, it'll go straight through to Chris.
Sent, thanks!